Older GPUs do not earn by being requested most. They earn by being cheap to hold, easy to host and good enough for a lot of real work.
Requests through the GPUaaS.com network concentrate heavily on Blackwell, and A100 and L40S do not feature prominently in the ranking of what buyers ask for. That does not mean they are worthless. This post sets out how Ampere and Ada capacity still produces revenue in 2026, what the economics look like and when a provider should keep, place or retire it.
- Older GPUs earn through low cost, wide availability and fit for small and mid-sized workloads rather than through volume of requests
- Public on-demand medians are about $2.75 for A100 80GB and $1.62 for L40S, and committed A100 40GB quotes at $1.00 to $1.50
- An illustrative A100 earns about $6,570 a year at $1.25 and 60% utilization against roughly $420 of power
- Halls built for racks of 8 to 12 kW can host A100 and L40S fleets but not Blackwell, which gives older hardware a facility advantage
- The risks are price pressure, falling resale value and being outcompeted on cost per token once FP8 is available
- Place older capacity on committed terms early, keep specifications precise and do not buy new for resale
What the demand data does and does not show
Buyers writing requests for committed clusters mostly name the newest parts. B300 leads, B200 follows, and H200, RTX PRO 6000 and GB300 NVL72 come next. A100 and L40S do not feature prominently in that ranking, and a provider planning a business on the assumption that large committed buyers are queuing for Ampere would be misreading it.
But the ranking measures one channel: committed cluster requests, which skew towards large buyers building at the frontier. A great deal of useful work does not look like that. Fine-tuning, small-model inference, development, rendering, vision and research all run on older hardware, and they are bought differently: in smaller blocks, on shorter terms and through self-serve routes. Older GPUs earn from that long tail.
What the public prices say
| GPU | Reference rate per GPU-hour | Source |
|---|---|---|
| A100 40GB, committed | $1.00 to $1.50 | GPUaaS.com network band |
| A100 80GB, on demand | About $2.75 median | 14 providers, October 2026 |
| L40S, on demand | About $1.62 median | 33 providers, October 2026 |
| H100 SXM, committed | $2.50 to $3.00 | GPUaaS.com network band |
The A100 and L40S medians sit at roughly the cost of a committed H100 hour or below, and prices for them have been stable while Hopper and Blackwell pricing has drifted up. These are mature, well-supplied parts, which is why they hold a floor rather than a premium. The A100 side is covered in the A100 floor of the market, and the L40S against RTX PRO 6000 in cost per token.
The economics of one A100
Take an illustrative A100 40GB already on the books. At $1.25 per GPU-hour it supplies 8,760 hours a year, and at 60% utilization it bills about 5,256 hours, or $6,570. An SXM A100 draws about 400 watts. At $0.10 per kWh and a PUE of 1.2, power comes to about $0.048 an hour, or roughly $420 a year running flat out.
| Illustrative A100 40GB, annual | Amount |
|---|---|
| Revenue at $1.25, 60% utilization | $6,570 |
| Power at $0.10 per kWh, PUE 1.2 | About $420 |
| Contribution before facility, staff and capital | About $6,150 |
If the card is already owned and written down, that contribution is largely margin, which is why holding older capacity is rational even when it is not exciting. If it were bought new today for a few thousand dollars, the payback would be roughly a year at these assumptions, and the capital would be exposed to falling resale values. The figures are illustrative, with the purchase price an assumption you should replace with your own.
The facility advantage
Here older hardware has a real structural edge. Many halls were built for racks of 8 to 12 kW. An eight-GPU A100 system draws roughly 6.5 kW, and an L40S server with a few cards draws less. Those fit existing racks, existing air cooling and existing power feeds. A B300 node draws about 14.5 kW and needs liquid cooling at density.
For an operator whose building cannot be upgraded, an Ampere or Ada fleet may be the only GPU business the facility can host. That is a legitimate reason to hold it, and the constraint is set out in what a GPU buyer will ask your facility.
Where the revenue comes from
Committed small and mid-sized blocks. Teams fine-tuning 7B to 13B models and running low-concurrency inference rent in blocks of eight to 64 GPUs on terms of three to twelve months, and the low rate is the attraction.
Inference demand. Capacity that is not fully booked can serve inference demand through packet.ai, which scales with usage rather than contract length. For small models that fit older cards this is a natural home for idle hours.
Specialised work. L40S in particular has a second market in rendering, video and graphics, where its strengths are not simply those of an inference accelerator and where Blackwell data centre parts are poor value.
The risks
Price pressure comes first. Older parts are abundant, and as more operators refresh fleets, used and rented supply grows. Resale value falls with age, a pattern covered in what used GPUs actually sell for, and it is not safe to assume a card will be worth in two years what it is worth now.
Cost per token is the second. Once a buyer can use FP8 or FP4, newer GPUs deliver more work per dollar even at higher hourly rates, so the pool of buyers for whom an older part is the cheapest option shrinks over time. And operational cost does not fall with age: older hardware fails more, and a failing fleet with a thin replacement process damages the reputation of everything else the provider sells.
Keep, place or retire
Keep older capacity that is written down, fits your facility and earns more than it costs to run. Place it deliberately: on committed terms earlier in its life while demand is steady, with a precise specification and honest delivery dates. Retire it when the contribution per rack no longer covers the power, space and support it takes, or when the space can host something that earns more.
Do not buy new Ampere for resale on the strength of a low rate card. The economics work for hardware you already own and for facilities that cannot host anything newer, and they work badly for fresh capital.
How to list it
The provider application asks for GPU models, total count and node configuration, and lets you record A100 among the models. State memory per card, form factor, interconnect and support terms in the free-text box. A100 80GB and 40GB are different products, and so are SXM and PCIe. One node is enough to start, and the form is walked through in the provider form, explained.
List your capacity and start getting quoted.
One node is enough to start. There is no cost to apply or list.
Apply as a providerFrequently asked questions
Is there still demand for A100 and L40S capacity?
Yes, but not through large committed cluster requests, which concentrate on Blackwell. It comes from fine-tuning, small-model inference, development, rendering and research, bought in smaller blocks on shorter terms.
How much can an A100 earn?
Illustratively about $6,570 a year at $1.25 per GPU-hour and 60% utilization, against roughly $420 of power. Replace the assumptions with your own.
Can an older data centre host A100 or L40S?
Generally yes. An eight-GPU A100 system draws about 6.5 kW, within the 8 to 12 kW racks many halls were built for, while Blackwell needs far more power and liquid cooling.
Should I buy new A100s to rent out?
Generally not. The economics work for hardware already owned and for facilities that cannot host anything newer, and badly for fresh capital exposed to falling resale values.
When should I retire older GPUs?
When contribution per rack no longer covers power, space and support, or when the space can host something that earns more.
Last reviewed: 17 November 2026. Public medians from provider price trackers, October 2026. A100 system power from NVIDIA's published specifications. Demand direction drawn from requests received through the GPUaaS.com network, reported as ranking only. Committed bands from the GPUaaS.com October 2026 benchmark. Earnings arithmetic is illustrative and assumes $0.10 per kWh, PUE 1.2 and 400 watts per card. Apply to list GPU capacity on GPUaaS.com.