A rate of $49.24 an hour sounds nothing like a rate of $6.16, and yet they are the same price: eight GPUs, billed per node.
The monthly committed-cluster benchmark reports bands per GPU-hour, by GPU, for a defined term. Providers quote in node-hours, monthly fees, annual prepayments and bundles, and until those are converted to one unit they cannot be compared. This post shows how to normalise your own rates, what information to have ready when you discuss pricing with the team and the mistakes that make a rate look better or worse than it is.
- The benchmark unit is dollars per GPU-hour on a committed term, for a defined cluster
- Convert node-hours by dividing by GPUs per node, and monthly fees by GPUs times 730 hours
- State term, cluster size, interconnect, region and availability date alongside every rate
- Separate the GPU rate from bundled storage, networking and support before comparing
- Report the rate you actually agree, not the list price
- Providers with questions about pricing context can contact partners@hosted.ai
What the benchmark measures
The benchmark publishes committed-term cluster bands per GPU-hour, for each GPU, each month, expressed as ranges because term length, cluster size, interconnect and region all move the final number. The October edition set out the first set, and the November edition carried it forward with what moved in public pricing.
For a provider the useful question is where your own rate sits against the band, and why. Answering that needs your rate in the same unit, and the unit is the part most often wrong.
The conversions
Node-hour to GPU-hour. Divide by the number of GPUs in the node. An eight-GPU H100 node at $49.24 an hour is $6.155 per GPU-hour. The reverse is a trap: a provider that bills per node and has a customer using two GPUs is charging $24.62 per GPU used, not $6.16.
Monthly fee to GPU-hour. Divide by the number of GPUs and by 730 hours, the average month. A node at $13,000 a month is $13,000 divided by 8 GPUs and 730 hours, or about $2.23 per GPU-hour.
Annual contract value to GPU-hour. Divide by GPUs and 8,760 hours. A 64-GPU cluster at $1,401,600 a year is $2.50 per GPU-hour.
Prepayment discounts. If you give 10% off for paying twelve months in advance, report both the list rate and the effective rate after the discount, and say which one the figure is. A discount is a real reduction only if it is not funded by an inflated list price.
| You quote | Conversion | Per GPU-hour |
|---|---|---|
| $49.24 per 8-GPU node-hour | 49.24 divided by 8 | $6.155 |
| $13,000 per node per month | 13,000 divided by 8 and 730 | $2.23 |
| $1,401,600 per year for 64 GPUs | 1,401,600 divided by 64 and 8,760 | $2.50 |
| $2.80 list with 10% prepay discount | 2.80 times 0.90 | $2.52 effective |
The fields that give a rate meaning
A bare number is not comparable. Alongside every rate, state the GPU and form factor, such as H100 SXM or PCIe. State the term and any term ladder, the cluster size and whether it is contiguous, the interconnect and its generation, the region and the date the capacity is available. Each of these moves a quote, and a rate without them could describe very different products.
Term moves it most. A twelve-month commitment lands lower than three months on the same hardware, because the provider is pricing certainty. Cluster size and contiguity come next, then interconnect tier. A published term ladder shows the pattern: one B300 card runs $7.49 on demand, $6.49 at twelve months, $5.99 at twenty-four and $5.49 at thirty-six.
Unbundling
Many providers bundle things into the headline rate: storage, a managed scheduler, egress, premium support, software licences. Comparing a bundled rate to a bare GPU rate overstates the difference. Separate the GPU compute rate from everything else, and list the extras alongside with their own prices or a statement that they are included.
Pass-through costs matter too. If power is metered and charged on top, say so, and give the assumed draw. A node pulling 14.5 kW at $0.10 per kWh adds about $1.45 an hour, which is $0.18 per GPU-hour, and that is a real difference between a power-inclusive and a power-exclusive quote.
Report what you agree, not what you list
List prices are aspirations and signed rates are facts. A provider whose rate card says $3.20 and whose contracts close at $2.70 has a market price of $2.70. If the figure being discussed is the list price, say so. Promotional rates and one-off concessions should be marked as such and kept out of the standing ladder, because a single discounted deal can make a normal rate look expensive.
Be equally careful with the opposite error. Quoting only the best deal you ever did flatters the figure and sets expectations the next buyer will not accept. The honest number is the one a buyer in a similar position would get today.
Where your rate sits against the band
Once normalised, compare it with the band for your GPU, but do not stop at whether it is inside or outside. A rate near the bottom of a band on a short term may be generous, and the same rate on a three-year term may be thin. A rate at the top with InfiniBand, contiguous capacity and a four-hour replacement commitment may be entirely reasonable.
Use the band as a sanity check on your floor and not as a target. A provider who prices from its own cost to hold a GPU-hour, as set out in how to price your GPU capacity for committed buyers, and then checks against the band, ends up with a rate it can defend. A provider who prices from the band alone inherits someone else's assumptions.
A one-page pricing sheet
Prepare one sheet per GPU. It should show the GPU and form factor, the available count and date, the term ladder in dollars per GPU-hour, the interconnect and cluster size those rates apply to, what the rate includes and excludes, the currency and the treatment of taxes. Update it monthly, since the market moves, and keep the previous version so you can see how your own ladder has changed.
It also helps with the application, because several of those fields are asked for directly. The walkthrough is in the provider form, explained.
Getting in touch
Providers in the network set their own rates, and the team provides market context to help them price competitively. A provider with a pricing question, or one who wants to talk through where a rate sits, can contact the team at partners@hosted.ai. Having the normalised sheet ready makes that conversation shorter and more useful.
List your capacity and start getting quoted.
One node is enough to start. There is no cost to apply or list.
Apply as a providerFrequently asked questions
What unit does the benchmark use?
Dollars per GPU-hour on a committed term, expressed as a range by GPU because term, cluster size, interconnect and region move the final number.
How do I convert a node-hour rate to GPU-hours?
Divide by the GPUs in the node. An eight-GPU node at $49.24 an hour is $6.155 per GPU-hour.
How do I convert a monthly fee?
Divide by the number of GPUs and by 730 hours. A node at $13,000 a month comes to about $2.23 per GPU-hour.
Should I report list prices or agreed rates?
Agreed rates, with the list price noted separately. Promotional and one-off rates should be marked and kept out of the standing ladder.
Who do I contact about pricing?
Providers with pricing questions can contact the team at partners@hosted.ai. Having a normalised pricing sheet ready makes the conversation more useful.
Last reviewed: 12 November 2026. Conversion examples are illustrative arithmetic. Node-hour and term-ladder examples from published provider rate cards, October 2026. Provider terms from the GPUaaS.com provider application page. Apply to list GPU capacity on GPUaaS.com.