A committed buyer is paying for certainty, so the rate a provider can ask depends on how much certainty the contract offers.
Most providers price the other way round. They start from a rate card, look at what competitors list and pick a number near it. That ignores the two variables that matter most: what the capacity costs to hold, and how long the buyer will commit to it.
- Start from the cost to hold a GPU-hour, not from a competitor's rate card
- An eight-GPU H100 server costs roughly $1.35 to $1.92 per GPU-hour to own at 70% utilization, depending on resale assumptions
- Term length is the largest lever. A published ladder runs from $7.49 on demand down to $5.49 at 36 months for the same B300
- A committed rate beats on-demand whenever on-demand utilization would fall below the ratio between the two rates
- Cluster size, interconnect, delivery date and support terms all move what a buyer will pay
- Pricing far below the market signals risk to a buyer rather than value
Start with the cost to hold a GPU-hour
A floor price comes from four lines: depreciation net of resale, power and cooling, facility and operations, and the cost of capital. An eight-GPU HGX H100 server runs about $285,000 integrated. If the cards retain roughly 55% of their value over three years, resale lands near $115,000 and net depreciation is about $170,000.
Across the plausible resale range, effective cost to own that server moves between $1.35 and $1.92 per GPU-hour at 70% utilization. A single idle H100 costs roughly $30 a day whether or not anyone rents it, because depreciation and contracted power do not pause.
Newer parts shift the arithmetic sharply. An eight-GPU B300 node quotes anywhere from $300,000 to $795,000 depending on build, and draws about 14.5 kW. Over three years at 70% utilization, owning it works out between $3.06 and $8.05 per GPU-hour. The spread comes almost entirely from what was paid for the hardware and where it sits, which is why a provider needs its own number rather than a market average.
Term is the biggest lever
One published B300 rate card runs $7.49 on demand, $6.49 on a twelve-month term, $5.99 at twenty-four months and $5.49 at thirty-six. Another provider lists $4.65 at thirty-six months and $4.10 at forty-eight. That ladder is the clearest picture of what a committed rate prices: the provider is selling certainty, and the discount scales with how much of it the buyer hands over.
Industry reserved pricing follows the same shape. One-year commitments typically sit 30 to 40% below on-demand, and multi-year terms can reach roughly 70% below. A provider quoting a single flat rate regardless of term is leaving money on the table at the long end and overcharging at the short end.
The practical approach is a ladder with three or four rungs: a short term at the highest rate, then twelve, twenty-four and thirty-six months, each priced against what you are willing to give up in exchange for guaranteed revenue. Decide the lowest rate you would accept on the longest term first, then work upward.
Why a lower committed rate can earn more
An eight-GPU node supplies 70,080 GPU-hours a year. Sold on a committed term at $2.50, fully booked, that is $175,200. Listed on demand at $3.50 and utilized 60% of the time, the effective rate is $2.10 and the node earns about $147,000. At 40% on-demand utilization the same node earns roughly $98,000.
The committed rate wins whenever on-demand utilization would fall below the ratio between the two rates, which here is about 71%. Few providers sustain that on demand, and utilization is the number most pricing models quietly assume at a flattering level. Committed revenue also arrives whether or not demand softens, which is what makes financing against it possible.
| Scenario, 8-GPU node, one year | Effective rate | Annual revenue |
|---|---|---|
| Committed at $2.50, fully booked | $2.50 | $175,200 |
| On demand at $3.50, 60% utilized | $2.10 | $147,168 |
| On demand at $3.50, 40% utilized | $1.40 | $98,112 |
Cluster size and contiguity
A buyer taking 256 GPUs in one contiguous block is worth more to a provider than the same count scattered across rooms, because the block is easier to operate, easier to support and harder to fragment. Contiguous capacity at scale prices differently from the same GPU count spread across nodes, and a request that tolerates non-contiguous allocation usually lands lower.
Small listings still matter. A single node is enough to list, and sixteen-GPU requests are normal. The rate for a small block should reflect the operational overhead of a customer who needs the same onboarding as a large one, rather than simply scaling down a large-cluster rate.
Interconnect, configuration and what surrounds the GPU
InfiniBand-connected capacity sits above Ethernet at the same GPU count, because multi-node training throughput depends on it. Liquid-cooled racks, NVLink domains and local NVMe all justify a premium for buyers who need them and are irrelevant to buyers who do not, so say what the configuration includes rather than leaving the buyer to infer it.
Support hours, replacement policy and uptime commitment are priced in too. A provider offering 24/7 support and a four-hour replacement commitment is selling a different product from one offering business-hours email, even on identical hardware. Buyers on production workloads pay for the first.
Delivery date is part of the price
Capacity that exists today commands more than capacity arriving in sixty days, but future capacity can be listed and sold ahead of delivery, and on current-generation hardware where lead times run 16 to 26 weeks, buyers will commit early to secure a date. A rack that lands with contracts already attached skips the ramp that normally follows installation.
State the availability date plainly. A buyer planning a training run two months out values a firm date more than a small discount, and a vague date prices as a risk.
The race to the bottom is a signal, not a strategy
A rate far below the market does not read as a bargain to a procurement team. It reads as a question: what is missing? Missing support, unreliable power, older hardware described as newer, or a provider who has not costed the capacity properly. Buyers with real workloads are cautious about all of those.
Price to cover your floor with a margin you can defend, and compete on the things that cost less to provide than they are worth: a clear SLA, fast responses to technical questions and a firm delivery date.
A pricing worksheet in five steps
First, calculate your cost to hold a GPU-hour: net depreciation, power, facility, operations and capital, divided by the hours you expect to sell. Second, set the lowest rate you would accept on a 36-month term. Third, build a ladder upward for 24, 12 and shorter terms, widening the gap at the short end. Fourth, add explicit adjustments for interconnect, contiguity and support terms. Fifth, check the result against published rate cards and the monthly benchmark to confirm it is plausible, then revisit it quarterly.
Market conditions move month to month. Median H100 on-demand pricing rose 15% year over year to $3.42 per GPU-hour in late September, against expectations of a decline, so a rate set in the spring may already be stale. The October benchmark shows where committed capacity is landing by tier.
List your capacity and start getting quoted.
One node is enough to start. There is no cost to apply or list.
Apply as a providerFrequently asked questions
How should a provider price committed GPU capacity?
Start from the cost to hold a GPU-hour, then build a ladder by term length, with the lowest rate on the longest commitment. Adjust explicitly for interconnect, contiguity and support terms, and check the result against published rate cards.
How much should a longer term discount the rate?
Published reserved pricing runs roughly 30 to 40% below on-demand at one year and up to about 70% below on multi-year terms. One B300 rate card steps from $7.49 on demand to $6.49, $5.99 and $5.49 across twelve, twenty-four and thirty-six months.
Can a lower committed rate earn more than on-demand?
Yes, whenever on-demand utilization would fall below the ratio between the two rates. A node committed at $2.50 earns about $175,000 a year fully booked, against roughly $147,000 on demand at $3.50 and 60% utilization.
What does it cost to own an H100 server per GPU-hour?
Between about $1.35 and $1.92 at 70% utilization over three years, on a roughly $285,000 eight-GPU server, depending on resale value. Utilization is the assumption that moves it most.
Should I price below the market to win deals?
Rarely. A rate far under the market reads to a buyer as a risk signal rather than a bargain. Price to cover your floor with a defensible margin, and compete on SLA clarity, response speed and a firm delivery date.
Last reviewed: 22 October 2026. Server cost and per-GPU-hour ownership figures from Mercatus H100 depreciation analysis and Haink's AI infrastructure cost guide, 2026. B300 node pricing and term ladders from published listings and provider rate cards, September to October 2026. Reserved discount ranges from Spheron's reserved GPU marketplace analysis. Idle cost and on-demand median from published market data, 2026. Figures are illustrative and should be replaced with your own cost inputs. Apply to list GPU capacity on GPUaaS.com.