A price rise at a major provider is a signal about the market. Nebius now lists on-demand H100 at $4.50. What it costs a steady workload and the alternatives to consider.

Nebius Alternatives After the October Price Increase

GPUaaS.com Team
GPUaaS.com Team
GPU Infrastructure
November 24, 2026
Blog post cover image
No items found.

A price rise at a major provider is not only a cost. It is a signal about the market, and a prompt to look at how you buy.

Nebius raised its on-demand H100 rate to $4.50 per GPU-hour effective 1 October, with H200 listed at $5.40 and B200 at $8.50. This post asks what that signals, what it costs a team running a steady cluster, which alternatives exist and how to decide, with the comparison between on-demand and committed products kept honest.

Key takeaways
  • Nebius lists on-demand H100 at $4.50, H200 at $5.40 and B200 at $8.50 per GPU-hour, with preemptible H100 from $0.79
  • A rise at a large specialist is a signal of tight supply, and it is consistent with median on-demand H100 pricing up 15% year over year
  • On a 32-GPU, 12-month H100 workload the gap between $4.50 on demand and a $2.75 committed midpoint is about $490,000
  • The comparison is directional, since on-demand buys flexibility and committed buys certainty
  • Options include a reserved quote from the same provider, committed capacity elsewhere, other specialists and splitting by workload
  • For EU buyers, the Data Act eliminates switching charges from 12 January 2027

What changed

Nebius, a specialist cloud headquartered in the Netherlands with data centres in Finland and France, now lists HGX H100 on demand at $4.50 per GPU-hour, effective 1 October, with preemptible H100 capacity starting at $0.79, a dynamic price that carries interruption risk. Its H200 is listed at $5.40 and B200 at $8.50. It is one of several providers whose published rates have risen over the past year, against the widespread expectation of falling prices as Blackwell volume grew.

The move is in line with the wider market. Median on-demand H100 pricing reached $3.42 per GPU-hour in late September, up 15% year over year, and an independent H200 rental index rose from $3.41 to $3.50 between 26 and 30 October. The wider picture is in the November benchmark.

A price rise is a procurement signal

Providers raise list rates when they can fill capacity at the higher price, which means demand is strong relative to supply. For a buyer that says three things. First, the on-demand rate is a poor basis for a budget, because it moves, and it has been moving up. Second, the provider's own bargaining position has improved, so a buyer relying on it for a large steady workload has less leverage than before. Third, there is no guarantee the rise is the last.

None of that means leaving. It means checking whether the way you buy still fits the way you use. A team paying on-demand rates for a cluster that has run continuously for six months is paying for flexibility it is not using.

What it costs a steady workload

Take 32 GPUs running continuously for twelve months, which is 280,320 GPU-hours. The table compares the listed on-demand rate with the midpoint of the committed band for the same GPU on the GPUaaS.com network.

32 GPUs, 12 monthsOn-demand listingCommitted band midpointDifference
H100 at $4.50 against $2.75$1,261,440$770,880$490,560
H200 at $5.40 against $3.13$1,513,728$876,000$637,728
B200 at $8.50 against $7.50$2,382,720$2,102,400$280,320

These compare an on-demand list rate with a committed band midpoint, which are different products, and the Nebius figure is not a reserved rate. A reserved quote from the same provider would sit below the list rate, and a committed quote could land anywhere inside the band. The gap on B200 is the narrowest, because that tier is the tightest. Use the table to size the question, not to answer it.

The options

Ask the same provider for a reserved quote. The list rate is the starting point of a negotiation for a large steady buyer. A committed term, a larger block or a longer commitment can move the number, and the answer costs nothing to find out.

Get committed quotes elsewhere. A request matched to 20+ vetted providers returns a quote in under 24 hours. Committed H100 SXM clusters quote at $2.50 to $3.00 per GPU-hour this quarter and H200 at $2.75 to $3.50, with contracts running between the provider, GPUaaS.com and the buyer. It is the most direct answer for a steady workload, and the trade is a quote and a term in place of a console.

Compare other specialists. Others publish different rates and structures, such as per-node billing and reserved discounts that are not published, covered in CoreWeave alternatives and Lambda alternatives. Aggregators let a team compare many in one console, as described in three ways to source a cluster.

Split by workload. Keep the on-demand provider for what needs flexibility: bursts, experiments and short jobs. Move the steady base to committed capacity. This is the pattern in running multi-provider GPU infrastructure, and it keeps the benefits of the existing relationship.

What the incumbent does well

A fair comparison names the strengths. Nebius is an EU-headquartered operator with data centres in Finland and France, which matters for buyers with residency or sovereignty requirements, and it offers a managed platform, on-demand launch and preemptible capacity for tolerant work. Moving away costs migration effort, and a team that values the platform and the jurisdiction may rationally pay more for it. The regional considerations are in GPU cluster pricing in Germany and the EU.

The cost of leaving

Migration has real costs: moving weights and datasets, re-validating performance, retraining operations staff on a new environment and running two providers for a period. Budget for transfer time on multi-hundred-gigabyte checkpoints. For EU buyers the picture is improving, since the EU Data Act requires switching charges to be eliminated from 12 January 2027, after a 30-day switching window that already applies. Whether it applies to a specific GPU contract is a question for counsel.

A sensible approach is incremental. Move one workload first, validate it and then decide. A second quote is also a lever: a provider that knows a competing figure exists tends to engage differently on term and rate.

A short decision rule

If the workload is bursty or uncertain, on-demand is doing its job and the price rise is a cost of flexibility. If it is steady and you can forecast it for three months or more, get a committed quote and compare. If you have residency requirements, make that a hard filter before comparing rates. And if you cannot tell, track utilization for a month first: committing hours you will not use is more expensive than the premium you were trying to avoid.

Price your steady workload as a committed cluster.

Quotes come back in under 24 hours from 20+ vetted partners. No buyer fees. For single GPUs, packet.ai handles self-serve access with 24/7 human support.

Get a quote

Frequently asked questions

What did Nebius change in October?

It lists on-demand H100 at $4.50 per GPU-hour effective 1 October, with H200 at $5.40, B200 at $8.50 and preemptible H100 from $0.79.

What are the alternatives to Nebius?

A reserved quote from the same provider, committed capacity from vetted providers, other specialist clouds and aggregators, or splitting steady and bursty workloads across providers.

How much could I save by committing?

For 32 H100 GPUs over twelve months, about $490,000 between a $4.50 on-demand rate and a $2.75 committed midpoint. The comparison is directional, since the products differ.

Does a price rise mean prices will keep rising?

Not necessarily, but there is no guarantee it is the last. Median on-demand H100 pricing is up 15% year over year, so on-demand is a poor basis for a budget.

Is it hard to switch providers?

It has real costs in data transfer, validation and operations. Move one workload first. In the EU, switching charges are eliminated from 12 January 2027 under the Data Act.

Last reviewed: 25 November 2026. Nebius rates from Shattered's October 2026 pricing analysis and public pricing pages. Median on-demand from the GetDeploying tracker via DataStorage, September 2026. H200 index from Silicon Data, 26 to 30 October 2026. EU Data Act dates from Regulation 2023/2854. The twelve-month arithmetic is illustrative and compares an on-demand list rate with a committed band midpoint. Rates change and should be confirmed with each provider. Browse current GPU cluster availability on GPUaaS.com.

Share this article:LinkedInX / TwitterCopy link
No items found.
FIND THE BEST GPU DEAL

Get a wholesale GPU quote in a few hours

NVIDIA B200, H200, H100, A100, RTX Pro 6000 — N. America, EU, MEA, APAC. No buyer fees.

Related articles