In Frankfurt, new high-megawatt power connections now carry multi-year lead times, and AI capacity is moving north and south to find power. In Europe the question is rarely the rate. It is where the electricity is.
Committed cluster bands for Germany and the wider EU sit in the same ranges as the rest of the GPUaaS.com network this quarter. This post sets them out, then covers where European GPU capacity actually is, what the regulation changes in January means for buyers and how to choose between Germany, the Nordics, France and Iberia.
- Committed bands match the network ranges: H100 SXM at $2.50 to $3.00, H200 at $2.75 to $3.50, B300 at $5.00 to $6.50 and B200 at $7.00 to $8.00 per GPU-hour
- One German provider lists H200 at EUR 3.00 per GPU-hour, close to the committed H200 band
- Power, not price, is the binding constraint, and new Frankfurt connections carry multi-year lead times
- The EU Data Act eliminates cloud switching charges from 12 January 2027
- The planned EU AI gigafactories are not expected to deliver capacity before about 2028
- Residency, sovereignty and the reach of foreign law are three different questions
The bands
| GPU | Committed band per GPU-hour | European context |
|---|---|---|
| H100 SXM | $2.50 to $3.00 | Widest choice, several EU-headquartered sellers |
| H200 SXM | $2.75 to $3.50 | One German list price is EUR 3.00 |
| RTX PRO 6000 | $1.25 to $1.75 | Lower power draw suits constrained halls |
| B300 SXM | $5.00 to $6.50 | Power and cooling decide availability |
| B200 | $7.00 to $8.00 | Check delivery dates |
Regional variation in committed pricing is minimal, and the same bands hold across most sourcing regions. The full set is in the November benchmark. For comparison, one hyperscaler's eight-GPU H100 instance works out near $6.88 per GPU-hour, and median hyperscaler H100 was about $7.89 in late September.
The power problem
Operators cite access to power as their single greatest challenge, and Europe's own estimates say total data centre power will not triple as required. Frankfurt, the continent's largest German hub at around 1.3 GW this year, now has multi-year lead times for new high-megawatt connections, according to market research. The consequence is that AI training capacity is displacing to the Nordics and Iberia, where power is available and in places cheaper and more renewable.
Rack density compounds it. AI clusters are reaching extreme densities, driving a shift to liquid and direct-to-chip cooling, and halls built for racks under 20 kW, which is still the largest share of the stock, cannot take current-generation hardware without work. The facility questions are in what a GPU buyer will ask your facility.
Who is selling GPUs in Europe
At least five EU-headquartered providers sell H100-class capacity: Scaleway and OVHcloud in France, Nebius, headquartered in the Netherlands with data centres in Finland and France, and Open Telekom Cloud and IONOS in Germany. Supply is real but narrower than the US hyperscalers in instance shapes, regions and on-demand availability. Deutsche Telekom's Industrial AI Cloud in Munich went live with Blackwell in the first quarter of 2026, and Nscale operates in Norway, Iceland and Portugal.
Public compute is a separate layer. EuroHPC funds AI Factories at research scale, and the exascale JUPITER system in Germany hosts one. Mistral is the largest private builder, reportedly investing around four billion euros in data centres in France and Sweden. For commercial committed capacity, buyers draw from the private providers above and from vetted operators sourced through a network, in any region except China.
The gigafactories are not a Q4 solution
The EU launched a call on 30 July 2026 for up to seven AI gigafactories, each planned with more than 100,000 advanced processors, co-funded with private investors. Read the timeline literally and no gigafactory capacity arrives before about 2028. A buyer planning for 2027 should treat them as a future source and not a current one. Public sources differ on programme size and structure, and some give a larger headline figure, so confirm details before relying on any one number.
The EU Data Act and January 2027
The EU Data Act has applied since 12 September 2025. It sets a 30-day cloud-switching window and requires switching charges to be eliminated entirely from 12 January 2027, with only reduced charges allowed in the transition. For buyers the effect is to lower the cost of leaving a provider, which weakens lock-in and makes a multi-provider strategy cheaper to run. The case for one is in running multi-provider GPU infrastructure.
Whether and how the Act applies to a specific committed GPU contract depends on the service and the contract, and it is a question for counsel. Buyers signing multi-year terms before January should ask how switching and data-transfer charges are treated and whether the contract anticipates the change.
Residency, sovereignty and foreign law
Three questions get run together. Residency is where the data physically sits. GDPR does not require EU personal data to stay in the EU, but it regulates transfers and rewards keeping it close. Sovereignty is who controls the infrastructure and under which jurisdiction it operates. And the reach of foreign law is whether a provider with a non-EU parent can be compelled by a foreign government to hand over data, which is why some regulated buyers prefer EU-headquartered operators, and why some certifications, such as Germany's C5 and France's SecNumCloud, matter in public-sector and financial procurement.
For high-risk AI systems the EU AI Act can add evidence requirements about where data has been. A buyer in a regulated sector should settle which of the three it needs before choosing a region, since an in-country location does not by itself answer the sovereignty question. Confidential computing on current GPUs can also encrypt data in memory for cases where the operator should not see it.
Choosing a region
| Region | Strength | Watch |
|---|---|---|
| Germany | Largest market, strong certification, industrial demand | Power lead times, density limits |
| Nordics | Power availability, renewable energy, cooling climate | Distance from users, fewer sovereign certifications |
| France | Nuclear baseload, Mistral and large builds, SecNumCloud | Competition for the same capacity |
| Iberia | New campuses, solar, available power | Younger ecosystem, network distance |
Multi-node training does not care which country it is in, only that the nodes share a fabric, so a training run can sit in the Nordics even for a German company if the data rules allow. Inference serving users in Frankfurt or Paris cares about latency, and regulated data may care about the country.
What to put in a European request
State the GPU and count, the interconnect, the term and the delivery date. State which countries are acceptable and which are not. State whether data is regulated, which framework applies and whether the operator's jurisdiction matters, not only its location. Ask for power and cooling specifications, and for the provider's certifications. Quotes come back in under 24 hours from 20+ vetted partners.
Get a quote for European capacity.
Quotes come back in under 24 hours from 20+ vetted partners. No buyer fees. For single GPUs, packet.ai handles self-serve access with 24/7 human support.
Get a quoteFrequently asked questions
What does a GPU cluster cost in Germany or the EU?
Committed bands match the network ranges: H100 SXM at $2.50 to $3.00, H200 at $2.75 to $3.50, B300 at $5.00 to $6.50 and B200 at $7.00 to $8.00 per GPU-hour. One German provider lists H200 at EUR 3.00.
Why is power the constraint in Europe?
New high-megawatt connections in Frankfurt carry multi-year lead times, operators cite power as their greatest challenge, and AI capacity is moving to the Nordics and Iberia where power is available.
What changes under the EU Data Act in January 2027?
Cloud switching charges are eliminated from 12 January 2027, after a 30-day switching window that applies since September 2025. Whether it applies to a given GPU contract is a question for counsel.
When will the EU AI gigafactories deliver capacity?
Not before about 2028. A call for up to seven, each planned with over 100,000 processors, launched on 30 July 2026, so buyers planning for 2027 should treat them as a future source.
Does GDPR require my GPU workload to stay in the EU?
Not outright. It regulates transfers of personal data and rewards keeping it close. Sovereignty and the reach of foreign law are separate questions that regulated buyers should settle separately.
Last reviewed: 18 November 2026. European data centre and power figures from the EUDCA's State of European Data Centres 2026 and Alice Labs' EU AI Infrastructure report. Provider list, IONOS and AWS rates from Qovery's European sovereign cloud guide, 2026. EU Data Act dates from Regulation 2023/2854 as summarised by eprecisio, 2026. Gigafactory call and Mistral investment from Safeguard's sovereign compute review of EuroHPC and Euronews reporting. Regulatory descriptions are general and not legal advice. Committed bands from the GPUaaS.com October 2026 benchmark. Browse current GPU cluster availability on GPUaaS.com.