GB300
Singapore
{"@context":"https://schema.org","@graph":[{"@type":"Service","@id":"https://gpuaas.com/gpu/gb300-singapore#service","name":"GB300 NVL72 GPU Cloud in Singapore","provider":{"@type":"Organization","name":"GPUaaS.com","url":"https://gpuaas.com"},"areaServed":{"@type":"Country","name":"Singapore"},"serviceType":"GPU cloud infrastructure","description":"Rent NVIDIA GB300 NVL72 rack capacity in Singapore from vetted partners, limited power-constrained inventory. Quotes within 24 hours."},{"@type":"WebPage","@id":"https://gpuaas.com/gpu/gb300-singapore#webpage","url":"https://gpuaas.com/gpu/gb300-singapore","name":"GB300 NVL72 GPU Cloud in Singapore","isPartOf":{"@type":"WebSite","name":"GPUaaS.com","url":"https://gpuaas.com"}},{"@type":"BreadcrumbList","@id":"https://gpuaas.com/gpu/gb300-singapore#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://gpuaas.com"},{"@type":"ListItem","position":2,"name":"GPU Cloud in Singapore","item":"https://gpuaas.com/gpu-cloud/singapore"},{"@type":"ListItem","position":3,"name":"GB300 in Singapore","item":"https://gpuaas.com/gpu/gb300-singapore"}]},{"@type":"FAQPage","@id":"https://gpuaas.com/gpu/gb300-singapore#faq","mainEntity":[{"@type":"Question","name":"Can I rent GB300 NVL72 capacity in Singapore?","acceptedAnswer":{"@type":"Answer","text":"Yes, though GB300 inventory is the thinnest of any generation given the power constraint."}},{"@type":"Question","name":"How much does GB300 cost per hour in Singapore?","acceptedAnswer":{"@type":"Answer","text":"Tracked on-demand rates span roughly $4.00 to $18.00 per GPU as of September 2026, with Singapore typically toward the upper half."}}]}]}
GPUAAS.COM · WHOLESALE GPU NETWORK / A HOSTED·AI SERVICE ◆ CAPACITY AVAILABLE · 20+ PARTNERSQUOTES < 24HREV 2026.09
+
+
GB300 NVL72 in Singapore · emerging supply
◆ AVAILABLE

GB300
in Singapore
, at
wholesale price.

GB300 NVL72 from vetted Singaporean partners, where the power constraint bites hardest of any generation, at
~30% less than hyperscale. Quotes in under 24 hours.

HGX GPU node
GPU generations
4
Architectures
Hopper + Blackwell
Vetted partners
20+
Quote turnaround
24 hrs
Commitment
Short / long
QUOTES IN UNDER 24 HOURS VETTED PARTNERS WORLDWIDE SHORT OR LONG TERM COMMITMENT DIRECT OPERATOR CONTRACTS CAPACITY AVAILABLE NOW PLACEMENT YOU SPECIFY
◆ THE SHORT ANSWER

Yes. You can rent GB300 NVL72 capacity in Singapore now through vetted partners, contracted directly with the operator running your rack. GB300's roughly 135-140kW-per-rack draw makes Singapore's existing power constraint the defining issue for this generation specifically, since the market was already the tightest covered on this site at earlier generations' lower draw. On GB300 price per hour, tracked on-demand rates span roughly $4.00 to $18.00 per GPU across a handful of providers as of September 2026, a wider band than established generations since fewer platforms publish a rate at all. GB300 NVL72 pairs 72 Blackwell Ultra GPUs with 36 Grace CPUs in a single 130TB/s NVLink domain, each GPU carrying 288GB of HBM3e for 20TB of aggregate rack memory. Satellite options in Johor or Batam are worth exploring specifically for GB300. For smaller workloads, B300 and B200 in Singapore remain the cheaper, more established options.

+
01
◆ PRICING

What GB300 capacity costs in Singapore

GB300 pricing here sits toward the upper half of the tracked range, and GB300's draw makes that premium sharper than it was for B300 or B200. Confirming real inventory matters more than comparing rates on paper.

Market reference ranges as of September 2026, quoted in USD, not Singapore-specific quotes. Figures are global and directional given the thin, fast-moving GB300 provider set.
Wholesale rates through GPUaaS.com are quoted per enquiry and vary by commitment term, configuration and placement.

$0$2.50$5$7.50$10$12.50$15/GPU-HR
Market low, tracked providers
Cheapest tracked GB300 on-demand
$4.00
Approx. median, tracked providers
Directional given thin provider count
$9.50
Market high, specialist providers
Specialist providers, Singapore placement
$16.00
Hyperscaler on-demand
What you pay without a broker
$18.00
◆ GPUaaS.com wholesale
Vetted partners · direct operator contract
quoted per enquiry
◆ GB300 RATES VARY WIDELY ACROSS A THIN PROVIDER SET
+
02
Where Singaporean GB300 capacity earns its keep

The workloads Singaporean GB300 capacity is built for.

Singapore is the largest datacentre market in Southeast Asia yet also the tightest, and GB300's roughly 135-140kW-per-rack draw makes that power constraint the defining issue for this generation specifically. A second allocation call for at least 200 MW opened December 2025, but that capacity is years from rentable, so confirmed GB300 inventory today is genuinely limited.

/01

Rack-scale coherent training

Train frontier models that need coherent memory across dozens of GPUs at once, in the limited power-constrained inventory Singapore can currently support, where the 130TB/s NVLink domain avoids the interconnect bottleneck of individual-card clusters.
GB300 NVL72 · 72-GPU domain · 20TB HBM3e
/02

Trillion-parameter inference

Serve trillion-parameter reasoning models in production, where NVIDIA rates GB300 NVL72 at roughly 10x the tokens-per-second-per-user of Hopper-based platforms for test-time scaling workloads.
GB300 rental · NVFP4 · test-time scaling
/03

Long-context at rack scale

Run the longest-context reasoning chains without offloading KV cache anywhere, holding more context in-rack than any generation covered on this site, with satellite options in Johor or Batam where in-market capacity is tightest.
20TB aggregate · 288GB per GPU · no spill
/04

Agentic workloads at scale

Serve high-concurrency, multi-agent workloads where token throughput per rack, not just per GPU, decides your cost per request, at NVIDIA's rated 5x improvement in throughput per watt over Hopper.
GB300 cluster · Dynamo · multi-agent
+
03
◆ LIVE NETWORK · 12 LOCATIONS

Vetted GPU partners worldwide, including Singaporean GB300 capacity.

GB300's draw makes Singapore's existing constraint the tightest of any generation. Tell us node count, interconnect and placement, and you talk straight to the operator running your rack.

Read the full guide to GPU cloud in this location →
4
GPU GENERATIONS
20+
VETTED PARTNERS
12
PLACEMENT OPTIONS
24h
QUOTE TURNAROUND
USA CAN UK DEU FRA NLD UAE SAU IND SGP JPN AUS
04
◆ COST COMPARISON

See how much you save at scale

Wholesale rates against cloud list price for a 64-GPU cluster.

CLUSTER SIZE
8 HGX nodes
64 × GPUS · 730 HRS/MO
ASSUMPTIONS · BLENDED $6.00/GPU-HR · INDICATIVE ONLY
SOURCEEST. MONTHLYVS GPUAAS
Retail cloud
On-demand list price · reserved discounts require lock-in
~$280k
+$84k
Direct datacentre negotiation
Long-term commitment · slow procurement cycle
~$230k
+$34k
◆ BEST VALUE
GPUaaS.com wholesale
Vetted partners · direct operator contract · quotes in 24 hours
~$196k
SAVE ~$84k/MO
Need single-GPU compute? packet.ai has you covered.
+
05
◆ HOW IT WORKS

A matchmaker, not a marketplace.

We connect you to our vetted partners. You contract directly with the operator running your nodes.

STEP 01/4
01

Tell us the requirement

GPU model, count, placement and timeline. Add workload detail if you have it.

STEP 02/4
02

We match capacity

We find vetted partners with capacity that fits, in the jurisdiction you need.

STEP 03/4
03

Quotes in 24 hours

Real quotes from partners who hold the capacity, not listings that may not exist.

STEP 04/4
04

Contract and provision

You contract directly with the operator. We smooth the provisioning process.

Ready to spec your cluster?
Get H100 cluster quotes
in under 24 hours.

Tell us the essentials. We'll line up real quotes from vetted wholesale providers . direct, no platform fee.

Quotes in under 24 hours
Direct contact with operators
No middle-man markup
20+ vetted providers · 10 regions
1
ESSENTIALS
2
OPTIONAL
Contact
Full Name *
Business Email *
Organization *
Location *
Region *
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
GPU Requirements
GPU Model *
PRE-SELECTED
Number of GPUs *
Individual GPU count. 1 node = 8 GPUs.
Get the Best Deal
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
+
06
◆ FAQ

Frequently Asked Questions

Q1
Can I rent GB300 NVL72 capacity in Singapore?

Yes, though GB300 inventory is the thinnest of any generation covered here. Singapore's power-capped market was already tight at earlier generations' lower draw, and GB300's roughly 135-140kW-per-rack draw makes available capacity scarcer still. Tell us your requirement and we will confirm availability within 24 hours.

Q2
How much does GB300 cost per hour in Singapore?

Tracked on-demand rates span roughly $4.00 to $18.00 per GPU as of September 2026, across a thin set of providers globally, and Singapore placement typically sits toward the upper half because colocation costs roughly triple the regional average. Wholesale rates through GPUaaS.com are quoted per enquiry and vary by commitment term, configuration and rack allocation.

Q3
GB300 vs B300: what's different?

GB300 NVL72 is a rack-scale system, not a single GPU: 72 Blackwell Ultra GPUs and 36 Grace CPUs share a single 130TB/s NVLink domain with 20TB of aggregate HBM3e. Full GB300 specs put each GPU at 288GB of HBM3e; B300 is the same silicon sold as an individual GPU or GB300 server node. GB300 suits jobs that need coherent memory across many GPUs at once; B300 suits everything that fits on one card.

Q4
Why is GB300 harder to find in Singapore than earlier generations?

A moratorium on new datacentres ran from 2019, and GB300's roughly 135-140kW-per-rack draw compounds the existing scarcity at a scale beyond what B300 or B200 needed. A second allocation call for at least 200 MW opened December 2025, but that capacity is years from rentable.

Q5
How many GB300 racks can I get in Singapore, and how quickly?

Availability depends on power-constrained inventory that is thinner for GB300 than for any earlier generation, so exact node counts vary week to week. Tell us node count and interconnect requirement and the quote will state exactly what is on hand, including satellite options in Johor or Batam.

Q6
What commitment terms are available for Singapore GB300 capacity?

Both on-demand and reserved terms exist, though reserved capacity is where most volume sits given how concentrated GB300 deployment remains among operators who control their own power and cooling. Tell us your timeline and we will confirm which route fits.