B300 is still the GPU buyers ask for most, ahead of B200, and Hopper has settled into a minority of requests.
This monthly snapshot ranks what buyers specified in requests coming through the GPUaaS.com network heading into November. It is built for providers deciding what to list, what to presell and how to price, and it reports direction and ranking only.
- B300 leads requests, with B200 clearly second
- Blackwell-class parts account for the clear majority of specified requests
- H200 sits third, with RTX PRO 6000 and GB300 NVL72 close together behind it
- H100 is a smaller but steady ask, and AMD MI300-series requests persist at low volume
- A visible share of requests are flexible and name no specific GPU
- Requests for Vera Rubin are appearing before the part ships
The ranking
Where a request names a specific GPU, the order this month runs as follows. The table gives rank and direction rather than counts, because the useful signal for a provider is where demand concentrates, not an absolute figure.
| Rank | GPU | What the pattern looks like |
|---|---|---|
| 1 | B300 | Most requested by a wide margin |
| 2 | B200 | Clear second |
| 3 | H200 | Leads the Hopper requests |
| 4 (tied) | RTX PRO 6000, GB300 NVL72 | Similar frequency, different buyers |
| 6 | H100 | Smaller, steady |
| 7 | AMD MI300-series | Low volume, persistent |
| Other | RTX 4090, Vera Rubin, flexible | Scattered, small |
What the ranking says
Buyers are specifying the newest generation available rather than the cheapest adequate one. That is unusual in a market where on-demand prices have been rising, and it reflects workloads that are memory-bound. A B300 carries 288GB of HBM3e against 192GB on a B200, and for long-context inference and large-batch serving the extra memory is the point of the purchase.
It also coincides with pricing that favours the newer part. Committed B300 bands sit below B200 this quarter, so buyers who specify B300 are not paying a premium for it. The mechanics are in the October benchmark.
Hopper demand has not disappeared. The H200 in particular holds third place because it offers 141GB of memory at a committed rate well below Blackwell. Buyers who do not need frontier compute but do need memory are finding it there.
What it means if you hold B300 or B200
If you hold B300 capacity, this is the part of the market with the most requests behind it. List it with a precise specification, including interconnect, cooling and delivery date, because requests for current-generation hardware are the most specific and the least forgiving of vague listings.
If you hold B200, the demand is real but the price relationship has shifted. B200 now commonly prices above B300 on committed terms, so a B200 listing needs to be clear about what it offers that B300 does not, such as earlier availability or a specific configuration. Lead times of 16 to 26 weeks on current Blackwell mean that availability itself is worth money, and capacity that is ready now has an advantage over capacity that is promised.
What it means if you hold Hopper
Hopper requests are a smaller pool, but they are steady and they come from buyers with clear workloads. H200 leads that group. H100 requests are fewer, which is consistent with H100 moving from a default choice to a deliberate one for specific jobs such as single-node inference, fine-tuning and workloads built around the existing software stack.
A provider with mixed fleets should not read the ranking as a reason to abandon Hopper. It is a reason to price it deliberately. Median on-demand H100 pricing rose 15% year over year to $3.42 per GPU-hour in late September, so older parts are not being discounted into irrelevance, and committed H100 SXM bands are $2.50 to $3.00 per GPU-hour this quarter.
The mid-tier and the rack-scale ask
RTX PRO 6000 and GB300 NVL72 appear at similar frequency, but from different kinds of buyer. The PRO 6000 draws teams running mid-sized inference that want 96GB on one card at a modest hourly rate. GB300 NVL72 draws buyers who want a single NVLink domain across 72 GPUs, usually for large-scale training or very large model serving.
Rack-scale capacity is the hardest to supply and the easiest to describe badly. A provider listing NVL72 needs to state cooling, power per rack and the exact configuration, because a buyer asking for a single memory domain will not accept an approximation.
AMD, Vera Rubin and the flexible requests
A small but persistent stream of requests names AMD MI300-series parts, including newer MI350-class cards. The volume is low, but the buyers asking are specific, and AMD capacity is scarcer than demand for it, which makes a listing easier to place than its raw request count suggests.
A handful of requests already name Vera Rubin, which is not shipping. Those buyers are planning ahead. Providers who expect Rubin deliveries can list future-dated capacity and start matching against requests that already exist.
A visible share of requests name no GPU at all and describe a workload instead. Those buyers are asking to be told what to use. A provider who can recommend a configuration, rather than only list one, is useful to them in a way a bare rate card is not.
What this snapshot does not show
It ranks GPUs. It does not report region, term length or cluster size, so it cannot tell a provider where to site capacity or how long a buyer will commit. It reflects requests, not closed deals, and a request is an expression of intent rather than a purchase.
It should be read alongside supply signals, such as lead times and pricing, rather than on its own. A GPU that is heavily requested and easy to source is a different opportunity from one that is heavily requested and scarce.
Using it
Check what you hold against the ranking. Where you hold a top-ranked part, list it now with a full specification and an honest delivery date. Where you hold a lower-ranked part, price it deliberately and consider whether a configuration change, such as adding interconnect, would move it into a more active segment.
And where you are planning purchases, treat the ranking as one input among several. Buying into the most requested part means competing with every other provider who reads the same signal, so lead times, pricing and your own cost floor matter as much as the request ranking does.
List your capacity and start getting quoted.
One node is enough to start. There is no cost to apply or list.
Apply as a providerFrequently asked questions
Which GPU are buyers requesting most?
B300, ahead of B200. Blackwell-class parts together account for the clear majority of requests that name a specific GPU, with Hopper now a minority ask led by H200.
Is there still demand for H100?
Yes, but as a smaller and steadier pool, usually for single-node inference, fine-tuning and workloads built around an existing stack. It is a deliberate choice rather than a default.
Do buyers ask for AMD GPUs?
A small but persistent stream of requests names MI300-series and newer MI350-class parts. Volume is low but the requests are specific.
Can I list Vera Rubin capacity before it ships?
Capacity can be listed with a future available date, and requests naming Vera Rubin already exist, so future-dated listings can start matching before delivery.
Why does the snapshot not give numbers?
The useful signal for a provider is where demand concentrates, so it reports ranking and direction. It covers GPU demand only and does not report region, term length or deal volume.
Last reviewed: 27 October 2026. Demand direction drawn from buyer requests received through the GPUaaS.com network, reported as ranking only. Lead times from Presenc AI GPU supply research. On-demand median from the GetDeploying price tracker via DataStorage's State of GPU Cloud report, September 2026. Committed bands from the GPUaaS.com October 2026 benchmark. Apply to list GPU capacity on GPUaaS.com.