In the Gulf, the questions that decide whether a GPU cluster can be sourced are about export licences and anchor tenants. The hourly rate comes third.
Committed cluster bands for the UAE and Saudi Arabia sit in the same ranges as the rest of the GPUaaS.com network this quarter. This post sets them out, then covers the supply picture in each country, the export-control and data-residency questions a buyer should settle first, and how to write a request that reaches the right capacity.
- Committed bands match the network ranges: GB300 NVL72 at $5.00 to $5.50, B300 at $5.00 to $6.50, B200 at $7.00 to $8.00 and H200 at $2.75 to $3.50 per GPU-hour
- The US authorised up to 35,000 GB300-equivalent chips each for the UAE's G42 and Saudi Arabia's HUMAIN in November 2025
- The UAE moved into US Country Group A:5 in July 2026, with named approved entities
- Stargate UAE's first 200 MW is targeted for 2026, and no operating-capacity figure has been published for it or for HUMAIN
- The practical question is how much capacity is unallocated and available to third-party buyers
- Data residency rules differ across the UAE federal regime, its free zones and Saudi Arabia
The bands
Regional variation in committed pricing is minimal, and similar bands hold across most sourcing regions, including the Gulf. What differs is whether a block of the right size and generation exists on a given date.
| GPU | Committed band per GPU-hour | Gulf context |
|---|---|---|
| GB300 NVL72 | $5.00 to $5.50 | The anchor-tenant generation |
| B300 SXM | $5.00 to $6.50 | Ask about unallocated blocks |
| B200 | $7.00 to $8.00 | Check delivery dates |
| H200 SXM | $2.75 to $3.50 | Established, more available |
| H100 SXM | $2.50 to $3.00 | Widest choice |
The full set is in the October benchmark. Hyperscaler on-demand medians ran near $7.89 for H100 and $14.24 for B200 in late September, which puts the committed bands well below published list rates, though the products differ.
The UAE: the earliest large phase
The UAE has the most advanced build-out in the region. Stargate UAE is a 1 GW cluster inside a planned 5 GW campus in Abu Dhabi, built for G42 on GB300-class hardware. Its first 200 MW is targeted to go live in 2026, with the builder saying in August that it was on track to hand capacity to customers this year. Existing UAE colocation capacity already exceeds 400 MW.
On the regulatory side, the US Commerce Department authorised G42 to buy the equivalent of up to 35,000 Blackwell GB300 chips in November 2025, subject to security and reporting conditions. In July 2026 a rule moved the UAE into Country Group A:5 and named G42 and Core42 as approved entities for advanced computing items.
What no public source states is how much of that capacity is unallocated and open to buyers outside the anchor customers. No operating-capacity figure has been published for Stargate UAE. That is the question to put to any provider offering Gulf capacity.
Saudi Arabia: large plans, limited public detail
Saudi Arabia's HUMAIN, owned by the Public Investment Fund, has announced very large targets: figures in circulation range from 500 MW over five years to 1.9 GW by 2030, and its first phase is 18,000 GB300 GPUs. Construction is under way on campuses at Riyadh and Dammam, with initial sites of up to 100 MW each, and a US authorisation of up to 35,000 GB300-equivalent chips was announced in November 2025.
Public detail on what is operating today is thin. No figure for operating capacity in megawatts appears in the cited sources, and reporting on the status of export approvals for specific shipments is not consistent. A buyer planning around Saudi capacity should treat dates as targets until a provider commits to one in writing.
What export controls mean for a buyer
Every GPU in these facilities is NVIDIA hardware running under US export conditions that the host countries did not write and cannot extend on their own. For a buyer renting capacity the implications are practical rather than abstract. The provider must be an approved entity or operate under an approved arrangement. End-use and reporting conditions may apply. And capacity can be affected if the rules change.
Ask the provider whether it is an approved recipient, what conditions its licence carries, and whether any of them flow down to customers. This is a compliance question for the buyer's own counsel, and nothing in this post is legal advice.
Data residency in the UAE and Saudi Arabia
The UAE has a federal personal data protection law covering processing and cross-border transfers, and its financial free zones, DIFC and ADGM, run their own data protection regimes with different rules. Which applies depends on where the data controller sits and what the data is.
Saudi Arabia's personal data protection law places conditions on transferring personal data abroad, and sector regulators and cybersecurity authorities set further requirements for government and critical-sector data, including in some cases that it remain in the Kingdom. A workload touching regulated data in either country should be assessed against the specific regime before a region is chosen, and the distinction between residency and sovereignty matters here.
Power and cooling in the heat
A B300 draws roughly 1,400 watts per GPU and a GB300 NVL72 rack runs at far higher densities, which means liquid cooling is a requirement rather than an option for current-generation hardware. In a hot climate that puts weight on the facility's cooling design and water or heat-rejection strategy. Buyers should ask for rack density, cooling method and the contracted power headroom as part of any quote.
UAE and Saudi Arabia compared
| Factor | UAE | Saudi Arabia |
|---|---|---|
| Anchor entity | G42 and Stargate UAE | HUMAIN and PIF |
| Export status | Country Group A:5, named approved entities | Authorisation announced, shipment status less clear |
| Existing colocation | 400+ MW | Early, building |
| Planning advice | Ask what is unallocated | Treat dates as targets until committed |
What to put in a Gulf request
State the GPU and count, the interconnect, the term and the delivery date, and say which country or countries are acceptable. Say whether regulated data is involved and which regime governs it. Ask explicitly for the provider's export-control status and the conditions that come with it.
Capacity can be sourced in any region except China, and quotes return in under 24 hours from 20+ vetted partners. Providers building in the Gulf can also list future-dated capacity ahead of delivery, so a buyer planning for the first half of next year can start matching against supply that is still being built.
Get a quote for Gulf capacity.
Quotes come back in under 24 hours from 20+ vetted partners. No buyer fees. For single GPUs, packet.ai handles self-serve access with 24/7 human support.
Get a quoteFrequently asked questions
What does a GPU cluster cost in the UAE or Saudi Arabia?
Committed bands match the network ranges: B300 at $5.00 to $6.50, GB300 NVL72 at $5.00 to $5.50, B200 at $7.00 to $8.00 and H200 at $2.75 to $3.50 per GPU-hour. The harder question is availability.
Is GB300 capacity available in the Gulf?
It is being built. The US authorised up to 35,000 GB300-equivalent chips each for G42 and HUMAIN, and Stargate UAE's first 200 MW is targeted for 2026, but no operating-capacity figure has been published and anchor tenants take priority.
Do US export controls affect renting GPUs in the Gulf?
They can. Providers operate under US licences or approved-entity status, with security and reporting conditions. Ask the provider about its status and whether conditions flow down to customers, and take advice from your own counsel.
Must my data stay in the UAE or Saudi Arabia?
It depends on the data and the regime. Both countries regulate cross-border transfers of personal data, the UAE free zones have their own rules, and Saudi sector regulators can require some data to remain in-Kingdom. Assess your workload before choosing a region.
Can I request capacity that is not built yet?
Yes. Providers can list future-dated capacity, so a buyer can start matching against supply still under construction. Treat dates as targets until a provider commits in writing.
Last reviewed: 4 November 2026. Stargate UAE capacity, timeline and licence details from The Gulf Tape, VLSI Korea's Stargate summary and Data Center World Middle East. HUMAIN capacity, chips and status from vision2030.ai, Introl and Safeguard's reviews of Bloomberg and Nvidia reporting. Export decisions per US Commerce Department statements of 19 November 2025 and 10 July 2026 as summarised by The World Data. Data law descriptions are general and not legal advice. Committed bands from the GPUaaS.com October 2026 benchmark. Browse current GPU cluster availability on GPUaaS.com.



